FREE Roofing Estimates
24 Hour Roof Replacement Guarantee
Call Icon
    Top

Call Our Roofing Experts! (504) 800-8196

Home/Service Areas/Louisiana/Harahan/Roof Insurance Claims

Roof Insurance Claims in Harahan, LA

Big Easy Roofing helps homeowners across Harahan and east bank Jefferson Parish document a roof after a storm. What a claim actually pays is between you and your insurer; what a claim can be supported by is what you and your roofer can put on paper. This page is about the second half.

Three foldersPre-storm, storm-day, claim file
Photographs, datedThe record starts before the storm
R.S. 29:732Anti-gouging during a declared emergency
Your insurer decidesThis page does not interpret coverage

Harahan roof insurance claim documentation at a glance

A homeowner's document trail supports a claim; it does not decide it. What the trail contains, and when each part of it is built, is what this page describes across three folders. The claim decision itself is between the homeowner and the insurer, and this page does not enter into that.

Folder one

Pre-storm baseline

A dated record of the roof before any damage: photographs of every elevation, the year the roof was installed, the material and manufacturer where you have it, and any known existing damage. This folder records the roof's condition on the recorded dates, and it is easiest to build long before the storm.

Folder two

Storm-day record

The event itself and what you did in the hours after it. The date and location of the storm, ideally with a National Weather Service or NOAA storm report; dated photographs of any visible conditions, taken when safe and without delaying urgent protection; and receipts for any immediate mitigation such as tarping. Where a state of emergency has been declared, La. R.S. 29:732 addresses price gouging within the designated area and applicable period; ask for an itemized written invoice that names the work, the address, the date and the amount charged.

Folder three

Claim file

The paper record after the claim is filed: the claim number and the insurer contact, the adjuster inspection date and the notes provided, and a written scope of loss from a roofing contractor against the damage found. Louisiana payment deadlines depend on the statutory category: La. R.S. 22:1892 generally provides 30 days after receipt of satisfactory proofs of loss, while La. R.S. 22:1892.2(A)(2) provides 60 days for catastrophic residential-property losses. Ask your insurer which applies to your claim.

What we do on the trail

Roof survey, photos, written scope

Our part of the trail is a survey of the roof and a written scope of loss against what the survey finds. We photograph the damage, we name the affected materials and quantities, and we deliver the scope in writing. We do not interpret your policy and we do not settle your claim.

What we do not do

Coverage interpretation

La. R.S. 37:2159.1 restricts a roofing contractor from acting as a public adjuster or interpreting insurance policy coverage. What a policy pays, what a deductible should be, whether specific damage is covered, and how a settlement is calculated are all matters for you and your insurer.

The permit is separate

A claim-funded reroof is still a reroof

Where the outcome of a claim is a repair or a reroof, the permit position follows from the work rather than from the funding source. Under La. R.S. 37:3737(I), reroofing on buildings other than one- and two-family dwellings goes to IBC Chapter 15; one- and two-family dwellings go to IRC Chapters 8 and 9 under subsection (I)(2). The applicable office is confirmed at the specific address.

A roof insurance claim is decided by an insurer against a policy the homeowner holds, and the insurer's decision considers many things the homeowner cannot control. The document trail on this page is what the homeowner CAN control: dated records of the roof from different points in time, organized so the homeowner and the insurer can each see what was where and when. A photograph of an intact roof taken a year before the storm is one of the cheapest pieces of paper a homeowner ever files, and it is the one hardest to substitute for after the fact.

The trail is the homeowner's. The roofer's part of it is defined and limited: survey the roof, photograph what the survey finds, write a scope of loss against what the survey finds, and, where a declared emergency is in force, deliver mitigation work at a documented, non-gouged price. What that scope translates into on a claim decision is a matter between the homeowner and the insurer, and La. R.S. 37:2159.1 keeps a contractor out of that conversation for good reasons.

Three folders and what each one records

Every folder collects a different class of information at a different time. The table sets out what each one contains, when to build it, and what it records. None of the three interprets a policy; together, they document the roof.

FolderWhen it is builtWhat it containsWhat it records
Folder one: pre-storm baselineBefore any damage, ideally on the day the roof is installed and updated once a yearPhotographs of every elevation, roof install date and material, manufacturer and warranty documents, any known existing damageThe condition visible on the recorded dates
Folder two: storm-day recordAs soon as practical after a storm, without delaying urgent protectionStorm date and location (NOAA or NWS report), dated photographs of visible conditions before any tarping or repair (when safe to take them), itemized receipts for any mitigation workThe reported weather event, the visible conditions and mitigation work, dates and charges
Folder three: claim fileFrom the day the claim is filed onwardClaim number and insurer contact, adjuster inspection date and any notes provided, written contractor scope of loss, submission dates and insurer correspondenceWhat was communicated and when, from every party to the claim

The three folders are not a substitute for a policy review, an adjuster inspection, or a coverage determination. They are the record that sits alongside those things. What any policy pays is a matter for the homeowner and the insurer, and this page does not enter into that. Call (504) 800-8196 to book a roof survey and receive dated photographs and a written repair scope.

The statutes and the permit route

Several Louisiana statutes shape what a roofing contractor can and cannot do around an insurance claim, and the permit position for any repair or reroof follows the work rather than the funding source. All references on this page are to public statute; none of them interprets any specific policy.

Contractor scope

La. R.S. 37:2159.1

Restricts a roofing contractor from acting as a public adjuster or interpreting insurance policy coverage. Our services include a roof survey, dated photographs, a written repair scope, and mitigation when needed. We do not interpret your policy and we do not settle your claim.

Payment deadlines

La. R.S. 22:1892 and 22:1892.2

La. R.S. 22:1892 generally provides a 30-day insurer payment obligation after receipt of satisfactory proofs of loss, subject to the statutory conditions. La. R.S. 22:1892.2(A)(2) provides a 60-day rule for catastrophic residential-property losses. Which deadline applies to any specific claim is a matter for the insurer to determine against the claim record.

Permit route on a claim-funded reroof

IBC Chapter 15 or IRC Chapters 8-9

A reroof funded by a claim is still a reroof, and the permit position follows the work rather than the funding. La. R.S. 37:3737(I)(1) routes buildings other than one- and two-family dwellings to IBC Chapter 15; subsection (I)(2) routes one- and two-family dwellings to IRC Chapters 8 and 9. The applicable office (City of Harahan Regulatory Department (504) 737-6765 inside the city limits, or Jefferson Parish outside them) issues the permit against the specific address.

Emergency pricing

La. R.S. 29:732

Prohibits price gouging during a declared state of emergency, within the designated emergency area and the applicable emergency period. Keep an itemized invoice recording the work, address, date and amount charged. The invoice documents the transaction; it does not by itself establish compliance with the statute.

How the storm-day record actually gets built

Photograph visible conditions when it is safe to do so and without delaying urgent protection. Where mitigation is needed immediately, install it and have the contractor photograph the roof before and after where possible. The homeowner's record does not require perfect ordering; it requires dated evidence of what the roof looked like at each stage.

Retain any itemized invoice for mitigation work alongside the photographs and any weather-event references. That is a mitigation record to keep with your claim documentation. Whether the mitigation cost is reimbursable under a specific policy is a matter between the homeowner and the insurer; the record exists either way.

What a written scope of loss contains

A scope of loss identifies the damaged material, its extent, and the work required to restore it. It names quantities, materials, and any code-required upgrades that follow from the damage. It does not name what a policy pays; that is the insurer's work against the homeowner's policy.

On a claim-funded reroof, the scope also names the permit route the work will engage (IRC Chapters 8-9 for a one- or two-family dwelling, IBC Chapter 15 for other buildings). Where the office covering the address issues the permit is decided by boundary, verified at the specific address.

After a Gulf storm and around the mitigation

The storm-day folder gets built in a short window. Two things reliably help the record: photographs of visible conditions, taken when safe and without delaying urgent protection, and itemized receipts for any mitigation work that names the work, the address, the date and the amount charged.

Photographs when safe, and without delaying protection

Once a tarp is on, the roof underneath is not visible in a photograph, so any pre-tarp photograph has to happen in the short window between the storm ending and the mitigation going down. Where it is safe and does not delay urgent protection, photographs of visible damage from the ground, from an upper window or from a smartphone camera on a pole record what was there.

Where urgent protection cannot wait, install the mitigation and photograph what is accessible before and after. The record does not require perfect ordering; it requires dated evidence of the roof at each stage. Photographing from a safe location without climbing onto the roof is enough for the record; the interior and safety come first.

Itemized receipts for mitigation

A tarp installed in the aftermath of a storm may fall inside a declared emergency period under R.S. 29:732. Ask for an itemized invoice that names the work, the address, the date and the amount charged. The invoice records the transaction; whether the pricing meets the statutory anti-gouging requirement in a specific case is decided against the statute's comparable-market and exception provisions, not by the invoice alone.

Keep the invoice with any timestamp records (a text confirmation, an email, a photograph of the tarp in place taken the day it went down). Those pieces together record when the mitigation happened and at what price; whether the pricing meets the statutory anti-gouging requirement is decided against the statute, not by the invoice on its own.

The address decides the office

If the outcome of the claim is a repair or a reroof, the permit for that work is issued by the office covering the specific address. ZIP 70123 covers both the Harahan city limits and unincorporated Jefferson Parish areas including Elmwood and River Ridge, so the postal address does not settle the office. Inside the city limits, the Regulatory Department on (504) 737-6765 handles it. Outside them, Jefferson Parish permits. The boundary is verified at the specific address.

Big Easy Roofing Process

The roofer's side of the trail is small and defined. Four steps, and none of them interprets what any policy pays.

Roofer photographing storm damage on a Harahan roof before a tarp is installed
01

Urgent protection first, where the roof is actively leaking

If water is entering the building, protection takes priority over documentation. We can install a tarp or other immediate weatherproofing on the same call, at an itemized rate, before any written scope. Photographs of visible conditions are taken when safe to do so.

02

Survey the roof and photograph what is found

Every elevation is documented (walked where safe, or from the ground where it is not), and any damage is photographed with the date on the photograph. What the survey finds becomes the basis of a written scope of loss.

03

Deliver a written scope of loss

The scope names the affected materials, the extent, and the work required to restore the roof. It names any code-required upgrades that follow from the damage and the applicable permit route. It does not name what a policy pays.

04

Coordinate the permit route where the claim funds a repair or reroof

Where the claim outcome is a repair or a reroof, we confirm the boundary at the specific address and file the permit with the City of Harahan Regulatory Department or Jefferson Parish as applicable. IRC Chapters 8-9 apply to one- and two-family dwellings; IBC Chapter 15 applies to other buildings. Call (504) 800-8196.

Everything else we do in Harahan

The rest of the Big Easy Roofing services available in Harahan, each with its own page. The two-role separation between a roofing contractor and a public adjuster sits on a sibling city insurance page. Storm and hail damage assessment sit on their own pages.

Filter by service type: