FREE Roofing Estimates
24 Hour Roof Replacement Guarantee
Call Icon
    Top

Call Our Roofing Experts! (504) 800-8196

Home/Service Areas/Louisiana/Kenner/Asbestos Roof Removal

Asbestos Roof Removal in Kenner, LA

Big Easy Roofing takes homeowners through an asbestos roof across Kenner and east bank Jefferson Parish starting with a laboratory sample rather than a quote. That result is what separates an ordinary tear off from work handled as abatement, and it decides who may carry it out, how the material comes off, and what the abatement adds before the replacement roof is priced on its own.

$1 or moreLouisiana licence threshold
Intact where feasibleThe federal removal method
25 sq ft, same dayThe small job limit
Two applicationsKenner building and demolition

Kenner asbestos roof removal at a glance

Nobody can tell you whether a roof contains asbestos by looking at it, so this work starts with a physical sample and a laboratory result. That result decides the licence position, the removal method and the disposal route, which is why no honest quote comes before it.

Removal cost

Call for an estimate

The laboratory result, the measured area and where the waste can go set this figure, and it sits as its own line beside the replacement roof rather than inside it. Call Big Easy Roofing on (504) 800-8196.

Louisiana licence threshold

$1 or more

The state licensing board lists asbestos abatement and removal under hazardous materials at a value of $1 or more, against $50,000 or more for commercial construction, and carries no friable exception in that threshold. Its subclassification for asbestos removal and abatement additionally requires Louisiana Department of Environmental Quality asbestos certification and is written about friable asbestos, so which classification a given roof calls for is settled with the board.

Estimated bulk sample

$50 to $150 each

At least one sample of every distinct material, read under polarized light microscopy, with the count set by whoever is sampling rather than by a rule. A single roof commonly holds two or three distinct materials, because the covering, whatever is under it and any mastic can each give a different answer.

Federal removal method

Intact where feasible

The construction asbestos standard requires roofing material to be removed in an intact state to the extent feasible, and wet methods where it is not intact or will not stay intact. Breaking, cutting, grinding or crumbling it is not a shortcut.

The small job limit

25 sq ft, same roof, same day

The exemption from wet methods and HEPA vacuuming applies only to intact roofing under 25 square feet removed by manual methods that keep the material intact, with no visible dust created, and the standard then requires all removal and repair work on the same roof on the same day to be counted together.

Two Kenner applications

Building, and demolition

The City publishes a Building Permit Application and a separate Demolition or Relocation of Structures Application. Which one a job is filed under is a question for the department, and neither form changes what the laboratory says.

Every figure on this page is an estimate, not a quote, and is subject to Big Easy Roofing sign off. Cost and timescale depend on size, pitch, access, weather, materials and whatever is found once work starts, so call Big Easy Roofing on (504) 800-8196 and we will come out and give you an estimate for your own roof.

Two asbestos products turn up on a roof. The first is asbestos cement sheet and shingle, the hard grey material often called transite. The second is asbestos containing asphalt felt and mastic in older built up and low slope sections. Neither announces itself, and a cement shingle that has weathered for fifty years looks like any other cement shingle. A laboratory result on a physical sample is the only thing that settles it.

The federal standard gets quoted loosely, so it is worth being exact. OSHA presumes asbestos in thermal system insulation and surfacing material in buildings constructed no later than 1980. Roofing is neither of those, so the law creates no presumption either way from the age of a roof. What age does do is tell you whether it is worth sampling. It does not tell you the answer, and anyone pronouncing on a roof from the driveway is guessing at your expense.

What is actually up there and how each one is handled

Four materials get sampled on a roof and they are not handled the same way. The fifth row is not a material, it is what a guess looks like. The last column is the EPA classification, and it matters because the method used on site is what moves a material into the regulated category.

MaterialHow it is confirmedEstimated removalEPA category if intact
Cement sheet or shingle, the grey product called transiteOne or more bulk samples, the count and the positions set by whoever is samplingPriced per roofCategory II nonfriable while it stays whole
Roofing felt, including each layer of a built up roofEach felt layer sampled in its own right, since a cap sheet can test differentlyPriced per roofCategory I nonfriable while it stays whole
Mastic, flashing cement and sealantIts own sample. An asbestos mastic can sit under a covering that tests clearCarried with the coveringCategory I where it is asphalt based
Cement panel where the eave turns down the wallTaken at the same visit, because one panel often runs roof to wallPriced per roofCategory II nonfriable; the wall part falls under a separate OSHA work practice
Anything identified by looking at itIt is not confirmed, it is a guessNot quotedUnknown until sampled

Sampling is the only figure that can be given up front. Removal is priced per roof rather than off a rate card, because the laboratory result, the area and the disposal route move it. Call (504) 800-8196 and we will sample it before anyone talks about price.

Who may do the work, and how it has to come off

Three separate sets of rules meet on an asbestos roof: who is allowed to do the work, how the material has to come off, and who permits the roof that goes back on. They are administered by three different bodies and a contractor needs all three answers before a start date is promised.

Who may do the work, and who will

Named on your quote

Louisiana licenses asbestos abatement and removal under hazardous materials at a value of $1 or more, and carries no friable exception in that threshold. The board subclassification for it additionally requires Louisiana Department of Environmental Quality asbestos certification and is written about friable asbestos. What the laboratory result, the condition of the material and the method change is which classification and which work practices apply, and that is settled with the board and named in writing on your quote rather than decided on a doorstep.

How it has to come off

Intact, to the extent feasible

The construction asbestos standard at 29 CFR 1926.1101 requires roofing material to be removed in an intact state to the extent feasible, and wet methods where it is not intact or will be rendered not intact during removal.

The sentence after the 25 square feet

Same roof, same day

The small job provision exempts intact roofing under 25 square feet from wet methods and HEPA vacuuming, but only where manual methods keep the material intact and create no visible dust. It then requires all removal and repair work on the same roof on the same day to be added together, so a roof cannot be cut into several small jobs in one day to stay under the figure.

The eave changes the rulebook

A different paragraph

Cementitious siding, shingles and transite panels on building exteriors other than roofs sit under a separate set of work practices. So the same panel can be governed by one paragraph on the roof and another where it turns down the wall.

What a compliant quote looks like

It names the laboratory and the analysis method, it lists how many samples are being taken and of what, and it separates the abatement from the replacement roof rather than folding them into one number. It also names where the waste is going, and who holds the classification for the abatement itself.

You should end up holding three documents: the laboratory report, the waste record, and photographs of the roof before and after. Those are the record of what was found and where it went, and they are worth keeping with the deeds rather than in a drawer.

What turns a contained job into a regulated one

Method, and the classification is the EPA's rather than OSHA's. Intact, both families are nonfriable and the work is contained. An asphalt roofing product that has been sanded, ground, cut or abraded, or a cement product with a high probability of being crumbled or reduced to powder by the forces expected to act on it, is caught by the definition of regulated asbestos containing material at 40 CFR 61.141. Two rulebooks meet here: the EPA sets the classification, OSHA sets the work practices on the roof.

That is not a technicality. A crew arriving with a circular saw and a skip can move a roof from one category to the other in an afternoon, and it is the homeowner who is left with the site and with the disposal problem, not the crew.

Two Kenner forms, and neither of them is the rule

Asbestos is an age question rather than a Kenner question. What is local is the paperwork around it, because the City runs building work and demolition on two separate applications, and neither form changes what the laboratory result says or who is allowed to handle the material.

The demolition form asks different questions

The City's Contractors and Tradesmen page publishes a Demolition or Relocation of Structures Application beside the Building Permit Application. The demolition form asks for notification of disconnects covering water, gas, power and sewerage, the total square footage and the cost of demolition. Those are questions about taking a building down.

Which application a particular job belongs on is a question for the Inspection and Code Enforcement Department on (504) 468-4062, option 1, and we ask it rather than deciding it for them. The Permits and Licensing page says the demolition of any building must be permitted and that cost varies, so there is no fee to read off the website either.

The asbestos rules do not move with the form

Whichever application the job is filed on, the abatement answers to the Louisiana State Licensing Board for Contractors and to Louisiana Department of Environmental Quality certification, and the removal method answers to the federal construction standard. A City form cannot lower either of those and does not claim to.

That is the practical point of this page. The sequence people get wrong is filing something first and sampling afterwards. Sampling first is cheaper, and it is the only order in which the rest of the decisions can actually be made.

Age of the house, not age of the street

Asbestos went into roofing products for decades and stopped being used in them gradually rather than on a date, so the year the house was built is the first reason to sample. Product records, an earlier survey and whatever is known about previous roof work all count as well. Because roofing carries no federal presumption either way, an old roof is not automatically asbestos and a newer one is not automatically clear.

The cheap and correct move is to sample before anyone quotes a tear off. Where the covering is already failing in several places, a roof inspection puts its condition on record at the same time.

Big Easy Roofing Process

Three steps, and the first one is the whole point. Beyond the controlled sampling itself, nothing is disturbed and no removal is priced until a laboratory has said what the material is.

A roofer taking a bulk sample from a cement roof sheet for laboratory analysis
01

Sample every distinct material

The covering, the felt or underlayment, and any mastic sampled separately and sent for polarized light microscopy. Sampling every distinct material is what stops a clean result on the covering hiding an asbestos mastic underneath it.

02

Set the licence, method and paperwork route in writing

What the result means for who may do the work and who will be doing it, whether removal is intact or wet, how the waste is contained and where it goes, and which Kenner application the department wants the job on.

03

Remove, document, then reroof

Removal carried out to the federal method by whoever holds the credentials the result calls for, photographs before and after, the laboratory report and the waste record handed to you, and the replacement roof permitted in its own right. Call (504) 800-8196 to get the roof sampled.

Everything else we do in Kenner

The rest of the Big Easy Roofing services available in Kenner, each with its own page and written estimate. An asbestos removal is quoted as a line on top of the replacement roof that follows it, rather than as a job on its own.

Filter by service type:

Kenner Asbestos Roof Removal FAQs

What a laboratory result decides, what the two City of Kenner applications decide, and why those are not the same question.

Topic

Question not here?

Ask us about an older roof on your Kenner house. No charge to ask.

Call (504) 800-8196
How do I know if my roof contains asbestos

Only from a laboratory result on a physical sample. OSHA defines presumed asbestos containing material as thermal system insulation and surfacing material in buildings constructed no later than 1980, so roofing material is not presumed asbestos containing simply because of its age. The year the house was built, and any records of earlier roof work, tell you whether to sample. They do not tell you the answer.

Does an asbestos roof removal go on the Kenner demolition form

That is a question for the Inspection and Code Enforcement Department on (504) 468-4062, option 1. The City publishes a Building Permit Application and a separate Demolition or Relocation of Structures Application, and it does not publish where a roof covering falls between them. The department decides, and the asbestos rules are the same either way.

What does a Kenner demolition permit cost

The City says the demolition of any building must be permitted and that cost varies, so there is no published figure. Any contractor quoting you a Kenner permit fee before the application has been reviewed is guessing.

What does asbestos roof removal cost in Kenner

The sample is estimated at $50 to $150 for each distinct material. The removal itself is priced per roof from the laboratory result, the measured area and the disposal route, as a line on top of the replacement roof that follows it, so it is not something anyone can quote off a rate card.

Does a small asbestos job still need a licensed contractor

There is no dollar threshold to hide behind. Louisiana licenses asbestos abatement and removal under hazardous materials at a value of $1 or more, against $50,000 or more for ordinary commercial construction, and carries no friable exception in that threshold. The board subclassification also requires Louisiana Department of Environmental Quality asbestos certification and is written about friable asbestos, so which classification a given roof calls for is a question for the board rather than an assumption we make for you. What the result changes is which classification and which work practices apply, settled with the board and the department once it is in, and named on your quote.

What is the 25 square feet rule

It is a work practice exemption, not a licence exemption. Intact roofing under 25 square feet can be removed without wet methods or HEPA vacuuming, as long as manual methods are used that keep the material intact and no visible dust is created. The standard then requires all removal and repair work on the same roof on the same day to be counted together.

Can the old roof just be broken up and thrown in a skip

No, and doing it changes the problem. The OSHA construction standard requires roofing material to be removed in an intact state to the extent feasible. Separately, sanding, grinding, cutting or abrading an asphalt product, or crumbling a cement one, brings it inside the EPA definition of regulated asbestos containing material at 40 CFR 61.141, with the disposal obligations that go with that.

What about the cement panels round the eave

They are sampled with the roof, because the same panel often runs round the eave and down the wall. Worth knowing: cementitious siding, shingles and transite panels on building exteriors other than roofs sit under a different set of OSHA work practices from the roof itself. The material keeps its EPA classification the whole way down; it is the work practices that change at the roof line.

What should I be holding at the end

Three things: the laboratory report naming the analysis method, the waste record showing where the material went, and photographs of the roof before and after. Those are what demonstrate the job was done correctly, and they matter at survey and at sale.

Get the roof sampled first and priced from the result

Nobody can read asbestos off a roof from the driveway, and no City form changes the answer. A laboratory result on a physical sample decides the licence position, the removal method and the disposal route, and the abatement is quoted as its own line beside the replacement roof rather than buried inside it. We take the paperwork question to the Kenner department rather than deciding it for them. If you would rather start in writing, tell us what the job involves and we will come back with an estimate.

Call (504) 800-8196
Asbestos Roof Removalin Kenner