Commercial Siding Installation in Madisonville, LA
Big Easy Roofing installs commercial siding across Madisonville and the Lake Pontchartrain shore of St. Tammany Parish. The parish publishes an exterior clad inspection checklist. Most of its code citations are R-numbered, and it does not say whether it applies to a commercial building, so we ask the office.
Madisonville commercial siding installation at a glance
Commercial cladding follows from the wall assembly behind it, so the wall is surveyed first. St. Tammany Parish publishes an exterior clad inspection checklist, and most of its code citations are R-numbered. It does not say whether it applies to a commercial building.
Assembly first
In our practice, the structure, insulation position and substrate are read before any product is named.
The parish checklist
St. Tammany Parish links an “Exterior Clad Checklist” from its Permits and Inspections page.
What it lists
Its items include “HOUSE WRAP R703.2”, “FLASHING R703.4.1”, “PROTECTION AGAINST DECAY R317” and “FLOOD RESISTANT CONSTRUCTION R322”.
R-numbered citations
The parish roofing sheet cites “the 2021 IRC chapter 9” with R-numbered sections such as R905. Most of the clad checklist’s citations are R-numbered too.
On a commercial building
In our reading, the checklist does not say what a commercial wall inspection covers. In our practice, we ask the office that covers the address.
Which office
Inside town limits, Town Hall on (985) 845-7311 confirms which office takes the permit.
Commercial siding is priced on area and assembly, so call Big Easy Roofing for a scoped price.
Four commercial wall assemblies and what sits behind each cladding
The cladding follows from the wall assembly, and the assembly follows from the structure. Four common commercial walls put the insulation in different places and attach the cladding to different substrates, and in our practice the survey settles which one the building has first.
| Wall assembly | Structural back-up | Insulation position | Cladding attaches to |
|---|---|---|---|
| Steel frame with exterior insulation | Steel studs with sheathing | Continuous over the sheathing | Furring or clips and rails into the studs |
| Masonry with exterior insulation | Concrete masonry or brick | Continuous over the masonry, where the assembly calls for it | Rails or fasteners into the masonry |
| Insulated metal panel | Steel frame or masonry | The foam core inside the panel | The listed panel system, joints sealed to the maker's detail |
| Tilt-up or precast concrete | The concrete panel itself | Interior side or in a furred cavity | Direct to the concrete or on furring |
These rows are not exhaustive; older and mixed walls are common. The approved assembly governs the details.
The parish clad checklist, and what it cites
St. Tammany Parish publishes inspection checklists, one of them for exterior cladding. It lists house wrap, flashing, decay protection and flood resistant construction, among other items. Most of its citations are R-numbered, the numbering the parish roofing sheet uses for the 2021 IRC.
Wrap and flashing
The checklist lists “HOUSE WRAP R703.2”, “FLASHING R703.4.1” and “BRICK FLASHING R703.8.5”.
Decay and flood
It lists “PROTECTION AGAINST DECAY R317” and “FLOOD RESISTANT CONSTRUCTION R322”.
Plans
It closes with “WALL CONSTRUCTION PLANS SHEETING PLANS”.
Where to read it
The checklist is linked from the St. Tammany Parish Permits and Inspections page.
What we take from that
The checklist lists what the parish names for a clad inspection, mostly with R-numbered citations.
It does not say what applies to a commercial building. In our practice, we ask the office before the scope is written.
For a house
The residential siding page covers the parish wind design memo.
Inside town limits, Town Hall on (985) 845-7311 confirms which office takes the permit.
Why it matters on a Madisonville building
Madisonville sits where the Tchefuncte River meets Lake Pontchartrain, and in our experience commercial walls here take wind driven rain and long humid summers. The water barrier and flashing behind the cladding do most of the work, which is why they are named in the scope.
Behind the cladding
In our experience, water that gets past the cladding is stopped by the barrier behind it.
Flashing at openings is where that barrier is most often broken.
Edges and openings
In our experience, cladding lifts first at corners, edges and openings.
Fastening there follows the approved assembly.
Working buildings
Most commercial re-cladding happens around a working business, in our experience.
The sequence is planned around it.
Big Easy Roofing Process
Four steps. The wall assembly comes before the cladding.

01 Survey the wall
Structure, insulation, substrate and openings.
02 Confirm the office
Town or parish by address, and what it inspects.
03 Write the scope
Cladding, barrier, flashing and fastening, each named.
04 Install and record
To the approved assembly, photographed for the record.
Everything else we do in Madisonville
The rest of the Big Easy Roofing services available in Madisonville, each with its own page and scope of work. For houses, the residential siding page covers the parish wind design memo and what it says about cladding on new construction.

Roof Replacement in Madisonville
Read More
Roof Repairs in Madisonville
Read More
Roof Inspection in Madisonville
Read More
Hail Damage Roof Repair in Madisonville
Read More
Storm Damage Roof Repair in Madisonville
Read More
Storm Damage Emergency Response in Madisonville
Read More
Emergency Roofing in Madisonville
Read More
Roof Leak Detection in Madisonville
Read More
Roof Maintenance in Madisonville
Read More
Roof Coating in Madisonville
Read More
Roof Ventilation in Madisonville
Read More
Roof Weatherproofing in Madisonville
Read More
Roof Restoration in Madisonville
Read More
Roof Flashing Repair in Madisonville
Read More
Fascia Board Installation and Repair in Madisonville
Read More
Gutters and Downspouts Installation in Madisonville
Read More
Gutters and Downspouts Repair in Madisonville
Read More
Siding Installation in Madisonville
Read More
Asbestos Roof Removal in Madisonville
Read More
Roof Damage Documentation in Madisonville
Read More
Commercial Roof Replacement in Madisonville
Read More
Commercial Roof Repairs in Madisonville
Read More
Commercial Roof Inspections in Madisonville
Read More
Commercial Hail Damage Repair in Madisonville
Read More
Commercial Re-Roofing in Madisonville
Read More
Commercial Roof Coating in Madisonville
Read More
Commercial Elastomeric Coatings in Madisonville
Read More
Commercial Roof Ventilation in Madisonville
Read More
Commercial Roof Leak Detection in Madisonville
Read MoreMadisonville Commercial Siding Installation FAQs
The parish clad checklist, wall assemblies, and how the work is priced.
Topic
Question not here?
Ask us about commercial siding in Madisonville. No charge and no obligation.
Call (504) 800-8196What does the parish exterior clad checklist cover?
Its items include house wrap, flashing, brick flashing, protection against decay, flood resistant construction, and wall construction and sheeting plans, most with an R-numbered code citation.
Does that checklist apply to a commercial building?
The checklist does not say. Most of its citations are R-numbered. Ask the office that covers the address what it inspects on a commercial wall.
Why survey the wall before choosing cladding?
The structure, insulation position and substrate decide how the cladding attaches.
Which office takes the permit in Madisonville?
The Town or St. Tammany Parish, depending on the address. Town Hall on (985) 845-7311 confirms which.
What does commercial siding cost?
In our practice, it is priced on area and assembly after the wall is surveyed.
Get the wall surveyed before the cladding on a Madisonville building
We read the wall assembly, ask the office what it inspects, and name the cladding, barrier and flashing in a written scope. If you would rather start in writing, tell us what the job involves and we will come back with an estimate.
Call (504) 800-8196