Big Easy Roofing Logo
Claim Banner - Big Easy Roofing Big Easy Roofing roof replacement guarantee banner
Call Our Roofing Experts!(504) 800-8196
Home/Service Areas/Louisiana/Madisonville/Commercial Siding Installation

Commercial Siding Installation in Madisonville, LA

Big Easy Roofing installs commercial siding across Madisonville and the Lake Pontchartrain shore of St. Tammany Parish. The parish publishes an exterior clad inspection checklist. Most of its code citations are R-numbered, and it does not say whether it applies to a commercial building, so we ask the office.

Exterior Clad ChecklistPublished by the parish
House wrap, flashing, decayAmong its items
R-numbered citationsMost of its items, per the checklist
Assembly firstThen the cladding

Madisonville commercial siding installation at a glance

Commercial cladding follows from the wall assembly behind it, so the wall is surveyed first. St. Tammany Parish publishes an exterior clad inspection checklist, and most of its code citations are R-numbered. It does not say whether it applies to a commercial building.

Assembly first

Then the cladding

In our practice, the structure, insulation position and substrate are read before any product is named.

The parish checklist

Exterior Clad Checklist

St. Tammany Parish links an “Exterior Clad Checklist” from its Permits and Inspections page.

What it lists

Wrap, flashing, decay, flood

Its items include “HOUSE WRAP R703.2”, “FLASHING R703.4.1”, “PROTECTION AGAINST DECAY R317” and “FLOOD RESISTANT CONSTRUCTION R322”.

R-numbered citations

Most of them

The parish roofing sheet cites “the 2021 IRC chapter 9” with R-numbered sections such as R905. Most of the clad checklist’s citations are R-numbered too.

On a commercial building

Ask the office

In our reading, the checklist does not say what a commercial wall inspection covers. In our practice, we ask the office that covers the address.

Which office

Town or parish, by address

Inside town limits, Town Hall on (985) 845-7311 confirms which office takes the permit.

Commercial siding is priced on area and assembly, so call Big Easy Roofing for a scoped price.

Four commercial wall assemblies and what sits behind each cladding

The cladding follows from the wall assembly, and the assembly follows from the structure. Four common commercial walls put the insulation in different places and attach the cladding to different substrates, and in our practice the survey settles which one the building has first.

Wall assemblyStructural back-upInsulation positionCladding attaches to
Steel frame with exterior insulationSteel studs with sheathingContinuous over the sheathingFurring or clips and rails into the studs
Masonry with exterior insulationConcrete masonry or brickContinuous over the masonry, where the assembly calls for itRails or fasteners into the masonry
Insulated metal panelSteel frame or masonryThe foam core inside the panelThe listed panel system, joints sealed to the maker's detail
Tilt-up or precast concreteThe concrete panel itselfInterior side or in a furred cavityDirect to the concrete or on furring

These rows are not exhaustive; older and mixed walls are common. The approved assembly governs the details.

The parish clad checklist, and what it cites

St. Tammany Parish publishes inspection checklists, one of them for exterior cladding. It lists house wrap, flashing, decay protection and flood resistant construction, among other items. Most of its citations are R-numbered, the numbering the parish roofing sheet uses for the 2021 IRC.

Wrap and flashing

R703

The checklist lists “HOUSE WRAP R703.2”, “FLASHING R703.4.1” and “BRICK FLASHING R703.8.5”.

Decay and flood

R317 and R322

It lists “PROTECTION AGAINST DECAY R317” and “FLOOD RESISTANT CONSTRUCTION R322”.

Plans

Wall and sheeting

It closes with “WALL CONSTRUCTION PLANS SHEETING PLANS”.

Where to read it

The parish permits page

The checklist is linked from the St. Tammany Parish Permits and Inspections page.

What we take from that

The checklist lists what the parish names for a clad inspection, mostly with R-numbered citations.

It does not say what applies to a commercial building. In our practice, we ask the office before the scope is written.

For a house

The residential siding page covers the parish wind design memo.

Inside town limits, Town Hall on (985) 845-7311 confirms which office takes the permit.

Why it matters on a Madisonville building

Madisonville sits where the Tchefuncte River meets Lake Pontchartrain, and in our experience commercial walls here take wind driven rain and long humid summers. The water barrier and flashing behind the cladding do most of the work, which is why they are named in the scope.

Behind the cladding

In our experience, water that gets past the cladding is stopped by the barrier behind it.

Flashing at openings is where that barrier is most often broken.

Edges and openings

In our experience, cladding lifts first at corners, edges and openings.

Fastening there follows the approved assembly.

Working buildings

Most commercial re-cladding happens around a working business, in our experience.

The sequence is planned around it.

Big Easy Roofing Process

Four steps. The wall assembly comes before the cladding.

Cladding being installed on a commercial building wall
01

01 Survey the wall

Structure, insulation, substrate and openings.

02

02 Confirm the office

Town or parish by address, and what it inspects.

03

03 Write the scope

Cladding, barrier, flashing and fastening, each named.

04

04 Install and record

To the approved assembly, photographed for the record.

Everything else we do in Madisonville

The rest of the Big Easy Roofing services available in Madisonville, each with its own page and scope of work. For houses, the residential siding page covers the parish wind design memo and what it says about cladding on new construction.

Filter by service type:

Madisonville Commercial Siding Installation FAQs

The parish clad checklist, wall assemblies, and how the work is priced.

Topic

Question not here?

Ask us about commercial siding in Madisonville. No charge and no obligation.

Call (504) 800-8196
What does the parish exterior clad checklist cover?

Its items include house wrap, flashing, brick flashing, protection against decay, flood resistant construction, and wall construction and sheeting plans, most with an R-numbered code citation.

Does that checklist apply to a commercial building?

The checklist does not say. Most of its citations are R-numbered. Ask the office that covers the address what it inspects on a commercial wall.

Why survey the wall before choosing cladding?

The structure, insulation position and substrate decide how the cladding attaches.

Which office takes the permit in Madisonville?

The Town or St. Tammany Parish, depending on the address. Town Hall on (985) 845-7311 confirms which.

What does commercial siding cost?

In our practice, it is priced on area and assembly after the wall is surveyed.

Get the wall surveyed before the cladding on a Madisonville building

We read the wall assembly, ask the office what it inspects, and name the cladding, barrier and flashing in a written scope. If you would rather start in writing, tell us what the job involves and we will come back with an estimate.

Call (504) 800-8196
Commercial Siding Installationin Madisonville