Big Easy Roofing Logo
Claim Banner - Big Easy Roofing 24 Hour Roof Replacement Guarantee
Call Our Roofing Experts!(504) 800-8196
Home/Service Areas/Louisiana/St. Rose/Commercial Re-Roofing

Commercial Re-Roofing in St. Rose, LA

Big Easy Roofing re-roofs commercial buildings across St. Rose and the east bank of St. Charles Parish. State law says the parish permits and inspects reroofing, and the regional handout says when the inspections happen, so we plan the sequence of the job around both.

State statuteR.S. 37:3737(I)
Before the coveringUnderlayment is inspected first
Phased jobsThe first inspection can become a partial
IBC Chapter 15For buildings other than 1 and 2 family

St. Rose commercial re-roofing at a glance

R.S. 37:3737(I) directs a parish that issues construction permits under that chapter to permit and inspect reroofing. For buildings other than one- and two-family dwellings that is done against International Building Code Chapter 15. The regional roofing handout sets out key inspection timing, and a phased job needs a plan that fits them.

The state statute

R.S. 37:3737(I)(1)

It says a parish that issues a permit for construction shall “Permit and inspect all buildings, other than one- and two-family dwellings, for roof construction and reroofing in compliance with the International Building Code Chapter 15 requirements as adopted and promulgated by the commission.”

Houses are the other limb

R.S. 37:3737(I)(2)

One- and two-family dwellings are covered by the next paragraph, against International Residential Code Chapters 8 and 9. This page is about the first paragraph.

Underlayment first

Before the covering goes on

The regional roofing handout says the on-site inspection is conducted on each roof plane, its photo sheet says on each section of the roof, and both say the inspection must be done before the roof covering is applied, with the photo sheet naming the underlayment inspection. Its flat roof sentence says that flat roof systems shall comply with the noted code references and the manufacturer’s installation instructions.

A phased job

The first inspection can become a partial

Under its on-site option the handout adds a note that if an inspection takes place and portions of the underlayment have not yet been applied, the first inspection will be changed to a “Partial”, and arrangements are made with the inspection department for additional roof inspections.

Who confirms it for your building

The parish

St. Charles Parish Planning and Zoning on (985) 783-5060 is a reasonable first call, and the commercial permitting guide directs building code questions to a South Central Development plan reviewer. We do not decide which inspection route the parish accepts.

What we will not interpret

Your insurance

Louisiana R.S. 37:2159.1 bars a roofing contractor from acting as a public adjuster or interpreting insurance policy coverage. We write the scope of the roof work.

This page addresses roofing on buildings other than one- and two-family dwellings. For a mixed use building, confirm with the parish which rules apply before scoping.

Our practice is to price commercial re-roofing on the area, the assembly and the access, so call Big Easy Roofing for a scoped price on your St. Rose building.

The inspection sequence, stage by stage

A reroof has a sequence, and the handout ties the inspections to it. The table sets out each stage, what the handout says about it, what that means for the job, and what we plan, so the inspection is not found out about when the crew is already on the roof.

StageWhat the handout saysWhat it means for the jobWhat we plan
Underlayment down, covering not yet on (where the assembly has an underlayment)The underlayment inspection must be done before the roof covering is appliedOn the on-site route, the covering waits for the inspectionThe inspection is booked before the day the covering is due
Only part of the underlayment is downThe first inspection is changed to a Partial, and arrangements are made for additional inspectionsMore than one inspection visit on the jobSections are sequenced so each is ready when its visit is due
Inspection of each roof sectionOn-site option: each roof plane. Photo sheet: each section of the roofEach plane or section is an inspection pointThe roof is divided into sections on the plan before work starts
Photographs offered as the other optionA separate sheet lists the photographs, and R.S. 37:3737(H) says the building official may accept themConfirm with the parish which inspection route applies to the jobWe ask which route the parish accepts before the job is scheduled

The handout is headed “Areas Where Wind Design is Required”. For flat roof systems it says they shall comply with the noted code references and the manufacturer’s installation instructions, so where an assembly has no underlayment stage we ask the parish which inspections apply.

What R.S. 37:3737(I) says, in both of its limbs

The statute opens with a single instruction to every municipality or parish that issues construction permits under that chapter, then splits by building type. Reading both limbs together shows which one a commercial building falls under and what the other one covers. The parish confirms how it applies to a given building.

The opening

A duty on the permitting authority

The commission’s compilation dated 1 August 2026 prints: “I. Any municipality or parish that issues a permit for construction pursuant to this Chapter shall do all of the following:”. The text also appears in enrolled Act 881 of 2026.

Paragraph (1)

Buildings other than one- and two-family

“Permit and inspect all buildings, other than one- and two-family dwellings, for roof construction and reroofing in compliance with the International Building Code Chapter 15 requirements as adopted and promulgated by the commission.”

Paragraph (2)

One- and two-family dwellings

“Permit and inspect one- and two-family dwellings for roof construction and reroofing in compliance with the International Residential Code Chapters 8 and 9 requirements as adopted and promulgated by the commission.”

The date

Projects beginning on or after 1 August 2025

The State Licensing Board for Contractors, in a memo of 12 August 2025, says Act 239 requires permitting and inspection of roof construction and reroofing of residential and commercial structures for any projects beginning on or after August 1, 2025.

Our reading, not the parish's

Paragraph (1) is worded as everything other than a one- or two-family dwelling, so a commercial building that is not a one- or two-family dwelling falls under it by its wording. A building that is partly residential is a question for the parish before the job is scoped.

We do not claim to know how the parish classifies any particular building.

What the statute does not say

This subsection does not set out the inspection steps. The handout and the permit’s own schedule carry the detail, and the parish says what applies.

It does not say whether a reroof may go over an existing covering. The handout speaks to that in two sentences, and the code chapter the statute points to also governs reroofing.

Phasing a reroof around its inspections

In our experience a big commercial roof is rarely replaced in one day. Phasing it means the inspections have to be planned with the sections, because the handout ties the underlayment inspection to the point before the covering goes on, and a missed inspection can affect the schedule.

Sections on the plan

Our practice: the roof is divided into sections on the plan before work starts, and each section is named, so the crew, the parish and the owner mean the same area.

Each section is ready for its inspection before its covering is due.

Weather moves the sequence

Rain and wind move a phased job, and, under the on-site option, an inspection booked for the next business day can land on a day the crew cannot work. Our practice is to hold the covering for a section until its underlayment inspection has happened or the route the parish has chosen is satisfied.

Our practice: a section left open at the end of the day is protected as far as the assembly allows, weather permitting.

Records by section

Our practice: photographs are taken section by section and kept with the permit and its inspection record, so the file shows the same sections the plan does.

Confirm with the parish which inspection route applies to the job.

Big Easy Roofing Process

Four steps. The sequence of the job is written around the inspections before the crew arrives.

A worker in a hard hat and work gloves reviewing a form on a clipboard
01

01 Survey and divide the roof

Layers, insulation moisture, deck condition and drainage, and the roof divided into named sections.

02

02 Ask the parish

Start with Planning and Zoning on (985) 783-5060, put building code questions to a South Central Development plan reviewer, and ask which inspection route is accepted.

03

03 Sequence the job around the inspections

Our practice: each section ready for its underlayment inspection before its covering is due, with the phasing agreed with the owner.

04

04 Re-roof and hand over the record

Work by section, photographed, with the permit and inspection record kept with the scope.

Everything else we do in St. Rose

The rest of the Big Easy Roofing services available in St. Rose, each with its own page and scope of work. Whether the old covering comes off is covered on the commercial roof replacement page, and a roof record before the job starts is covered on the commercial inspection page.

Filter by service type:

St. Rose Commercial Re-Roofing FAQs

The statute, the inspections, and the sequence of a commercial reroof on a St. Rose building.

Topic

Question not here?

Ask us anything about re-roofing your St. Rose building. No charge and no obligation.

Call (504) 800-8196
Does Louisiana law require a permit for a commercial reroof

Where a parish issues construction permits under that chapter, the statute directs it to permit and inspect. R.S. 37:3737(I)(1) says a municipality or parish that issues a permit for construction shall permit and inspect all buildings, other than one- and two-family dwellings, for roof construction and reroofing in compliance with International Building Code Chapter 15. The parish confirms how that applies to your job. Separately, the State Licensing Board memo of 12 August 2025 says Act 239 requires permitting and inspection of roof construction and reroofing for projects beginning on or after 1 August 2025.

Who issues the permit in St. Rose

St. Charles Parish. St. Rose is unincorporated and the parish has no incorporated municipalities, so Planning and Zoning on (985) 783-5060 is the first office to call.

What is the difference between paragraph (1) and paragraph (2)

Paragraph (1) covers buildings other than one- and two-family dwellings and points to International Building Code Chapter 15. Paragraph (2) covers one- and two-family dwellings and points to International Residential Code Chapters 8 and 9.

When is the underlayment inspected, where the assembly has one

The regional roofing handout says the inspection must be done before the roof covering is applied, and its photo sheet names the underlayment inspection. Its on-site option inspects each roof plane, and its photo sheet refers to each section of the roof.

What happens on a phased reroof

Under its on-site option the handout adds a note that if an inspection takes place and portions of the underlayment have not yet been applied, the first inspection will be changed to a Partial, and arrangements are made with the inspection department for additional roof inspections.

Can photographs replace an inspection visit

R.S. 37:3737(H) says the building official may accept location-verified photographs or videos for required roofing or reroofing inspections, and the handout lists the photographs for that route. Confirm with the parish which inspection route applies to your job, and we ask before the job is scheduled.

Does my reroof have to include a tear off

The handout says all existing layers come off first where there are two or more applications of coverings, and that attaching a new covering to existing wood shake, slate, clay, cement or asbestos-cement tile is not allowed. For a single covering of another type the handout’s two sentences say nothing so we ask the building official before specifying a recover.

Can my roofer act as my public adjuster

Louisiana R.S. 37:2159.1 bars a roofing contractor from acting as a public adjuster or interpreting insurance policy coverage. Ask your insurer about coverage.

Plan the reroof around its inspections before any crew is booked

We survey the roof, divide it into sections, and put the statute and the inspection questions to the parish before the job is sequenced. If you would rather start in writing, tell us what the job involves and we will come back with an estimate.